Daily
AI Infrastructure Daily: everything that happened across chips, memory, power, data centers and financing in a 3-minute read, every weekday. Free. Read today's →
NVDA$216.0+2.38%TSM$427.1+2.06%SK hynix₩1,275,000−0.16%Samsung Electronics₩213,000−1.16%MU$911.8+3.91%ASML$1,599.8+1.78%AVGO$330.6+2.76%LITE$834.8+10.40%COHR$224.3+7.18%ANET$178.9+3.81%GEV$858.4+5.32%ETN$374.6+2.31%VRT$200.1+2.98%CEG$253.7+0.12%VST$142.8+1.90%PWR$566.3+3.64%HD Hyundai Electric₩447,000−4.89%MP$37.91−1.03%FCX$65.21+0.04%CCJ$79.25+0.83%MSFT$530.4+1.12%META$638.8−0.60%CRWD$260.3+1.04%SMH$543.4+3.07%SPY$765.5+0.73%
NASDAQ · US · Semiconductors

NVTS Navitas Semiconductor

GaN power ICs for AI power supplies

Tight but sold off Its supply chain is tightening but the stock is below its 50-day average — price and fundamentals disagree. (automatic: supply-chain trend + price vs 50-day average)
Last close (delayed) · 2026-10-26
$8.52
+1.61% today
1W
−1.3%
1M
−30.2%
3M
−14.9%
YTD
+19.3%
1Y
−39.5%
Off 52w high
−73.2%
Next earnings (est.): 2026-11-03
Market cap$2.20B
P/E (trailing)—Forward -66.5
EV / sales45.6×EV/EBITDA -23.9×
Revenue (TTM)$36.53MGrowth -27.3% y/y
Margins38.1%gross · op -255.0%
Free cash flow-$3.81MCash $557M · debt $5.14M
Analyst target$14.07+65.2% upside · 8 analysts · hold
Riskβ 3.96Short 20.3% of float

Fundamentals from public market data, refreshed daily (2026-10-24 02:59 UTC). Figures in reporting currency.

NVTS · price with what management and the data said

Supply tighteningBeat / raiseMiss / cutData releaseEasing Hover a numbered marker for details · dashed lines = 50- and 200-day averages

Timeline: management commentary, data & earnings

8 events
  1. 8
    2026-07-27EarningsBeat / raise

    Reported EPS -0.04 vs -0.04 expected (+5.3% surprise).

  2. 7
    2026-05-05EarningsBeat / raise

    Reported EPS -0.04 vs -0.05 expected (+15.9% surprise).

  3. 6
    2026-02-24EarningsBeat / raise

    Reported EPS -0.05 vs -0.05 expected (+3.9% surprise).

  4. 5
    2025-11-03EarningsMiss / cut

    Reported EPS -0.05 vs -0.05 expected (-0.5% surprise).

  5. 4
    2025-08-04EarningsBeat / raise

    Reported EPS -0.05 vs -0.05 expected (+0.4% surprise).

  6. 3
    2025-05-05EarningsBeat / raise

    Reported EPS -0.06 vs -0.06 expected (+2.9% surprise).

  7. 2
    2025-02-24EarningsBeat / raise

    Reported EPS -0.06 vs -0.06 expected (+1.9% surprise).

  8. 1
    2024-11-04EarningsBeat / raise

    Reported EPS -0.06 vs -0.06 expected (+3.9% surprise).

Earnings history

EPS vs expectations
DateExpected EPSReported EPSSurprise
2026-07-27-0.04-0.04+5.3%
2026-05-05-0.05-0.04+15.9%
2026-02-24-0.05-0.05+3.9%
2025-11-03-0.05-0.05−0.5%
2025-08-04-0.05-0.05+0.4%
2025-05-05-0.06-0.06+2.9%
2025-02-24-0.06-0.06+1.9%
2024-11-04-0.06-0.06+3.9%
2024-08-05-0.07-0.07−6.6%
2024-05-09-0.05-0.06−9.4%
2024-02-29-0.05-0.04+15.6%
2023-11-09-0.05-0.04+26.3%
2023-08-14-0.07-0.05+29.4%
2023-05-15-0.08-0.07+9.7%
2023-02-23-0.07-0.06+17.2%
2022-11-09-0.07-0.07+1.8%
2022-08-15-0.09-0.07+21.1%
2022-05-12-0.08-0.08—
2022-02-15-0.08-0.07+7.9%

About Navitas Semiconductor

Website ↗

Navitas Semiconductor Corporation designs, develops, and markets power semiconductors in the United States, Europe, China, rest of Asia, and internationally. The company offers gallium nitride power integrated circuits, silicon carbide power devices, silicon system controllers, and digital isolators for power conversion and charging. Its products are used in automotive, data center, mobile, consumer electronics markets, and various other applications. The company was founded in 2014 and is based in Torrance, California.

190 employees · Torrance, United States

100kW+ racks force 800V DC architectures, GaN/SiC conversion and new power shelves. Power density per rack is now a design constraint.

Power semis→PSU / shelf→Busbar→Rack

What would prove us wrong. Weakens if rack densities stall and legacy 54V designs remain sufficient.

800V DC racks need silicon-carbide and gallium-nitride switches at every conversion step. Capacity is ample after the EV slowdown, so the constraint is qualified AI designs, not wafers.

SiC / GaN wafer→Power device→Converter→Rack

What would prove us wrong. Strengthens if 800V adoption outruns qualified GaN/SiC supply for AI power shelves.

Peers at the same bottleneck

Who else supplies this

StockRoleLast1D1MYTDTrend
2308.TW
Delta Electronics
Power shelves and thermal for AI racks NT$1,560.00.00%−16.8%+62.8%
MPWR
Monolithic Power Systems
Voltage regulation for accelerators $1,171.6+2.77%−14.2%+29.9%
IFX.DE
Infineon Technologies
SiC/GaN power semis for 800V DC racks €50.20+3.14%−11.5%+34.1%
VICR
Vicor
High-density power modules $193.4+9.84%−31.4%+76.4%
ON
onsemi
SiC power and image sensors $74.15+2.63%−4.0%+36.9%
2301.TW
Lite-On Technology
AI server power supplies and shelves NT$255.50.00%−11.4%+60.5%
STM
STMicroelectronics
SiC and GaN power devices $45.52+3.40%−12.3%+76.5%
POWI
Power Integrations
GaN power conversion $47.19+0.45%−9.6%+34.3%
6963.T
Rohm
SiC power devices ¥3,630.0−2.73%−23.4%+64.8%

Not investment advice. Prices delayed and in local currency. Quotes in "double quotes" are verbatim as reported by the linked source; other commentary is our paraphrase. Earnings dates are estimates.