Grid Connection & Transmission
Interconnection queues measure in years. Energised megawatts — not empty shells — pace AI buildout, and new lines take the better part of a decade.
Generation→Queue study→Line + substation→Campus
88
Tightness score ⓘ
#3 of 56
▲ Tightening
Lead time
36–84 mo
Theme 1M
−4.6%% in uptrend
40%Metric to watch
Interconnection queue data, large-load tariffs, and transmission capex plans.
What would prove us wrong
Weakens if queue reforms cut time-to-power below two years at scale.
Interconnect theme performance
Equal-weight · rebased 100 · 1YStocks we track
Who controls this bottleneck
Roles, not recommendations. Delayed prices; local currency.
| Stock | Role | Listing | Last | 1D | 1M | 3M | YTD | Off 52w high | Trend | Next earnings |
|---|---|---|---|---|---|---|---|---|---|---|
| PWR Quanta Services |
Grid construction and craft labour at scale | NYSE US |
$566.8 | +3.73% | −12.7% | −3.6% | +34.4% | −27.8% | 2026-10-29 | |
| MYRG MYR Group |
Transmission and electrical construction | NASDAQ US |
$262.7 | +3.24% | −10.2% | −22.9% | +20.2% | −47.6% | 2026-10-28 | |
| MTZ MasTec |
Power delivery and pipeline construction | NYSE US |
$175.3 | +2.49% | −17.6% | −43.9% | −19.4% | −59.9% | 2026-10-29 | |
| AEP American Electric Power |
765kV transmission and large-load interconnects | NASDAQ US |
$129.5 | −0.17% | +9.4% | −1.9% | +14.9% | −5.9% | 2026-10-28 | |
| NEE NextEra Energy |
Largest generation and transmission developer | NYSE US |
$82.22 | +0.14% | +8.1% | −7.2% | +4.6% | −14.8% | 2026-10-21 |
Recent headlines
Auto-updated- NextEra Eyes Strong Backlog, Data Center Hub StrategyIndustrial Info · 2d ago
- Quanta Services, Inc. (PWR) Offers Exposure to Grid Modernization and AI InfrastructureYahoo Finance · 3d ago