NVDA$216.0+2.38%TSM$427.1+2.06%SK hynix₩1,275,000−0.16%Samsung Electronics₩213,000−1.16%MU$911.8+3.91%ASML$1,599.8+1.78%AVGO$330.6+2.76%LITE$834.8+10.40%COHR$224.3+7.18%ANET$178.9+3.81%GEV$858.4+5.32%ETN$374.6+2.31%VRT$200.1+2.98%CEG$253.7+0.12%VST$142.8+1.90%PWR$566.3+3.64%HD Hyundai Electric₩447,000−4.89%MP$37.91−1.03%FCX$65.21+0.04%CCJ$79.25+0.83%MSFT$530.4+1.12%META$638.8−0.60%CRWD$260.3+1.04%SMH$543.4+3.07%SPY$765.5+0.73%
NYSE · US · Engineering & Construction

MTZ MasTec

Power delivery and pipeline construction

Tight but sold off Its supply chain is tightening but the stock is below its 50-day average — price and fundamentals disagree. (automatic: supply-chain trend + price vs 50-day average)
Last close (delayed) · 2026-10-26
$174.4
+1.98% today
1W
−8.6%
1M
−18.1%
3M
−44.2%
YTD
−19.8%
1Y
−17.7%
Off 52w high
−60.1%
Next earnings (est.): 2026-10-29
Market cap$13.74B
P/E (trailing)27.3Forward 13.8
EV / sales1.0×EV/EBITDA 12.7×
Revenue (TTM)$16.11BGrowth 23.4% y/y
Margins12.9%gross · op 5.4%
Free cash flow-$57.90MCash $316M · debt $3.24B
Analyst target$364.9+109.2% upside · 21 analysts · strong buy
Riskβ 1.84Short 7.2% of float

Fundamentals from public market data, refreshed daily (2026-10-24 02:59 UTC). Figures in reporting currency.

MTZ · price with what management and the data said

Supply tighteningBeat / raiseMiss / cutData releaseEasing Hover a numbered marker for details · dashed lines = 50- and 200-day averages

Timeline: management commentary, data & earnings

8 events
  1. 8
    2026-07-30EarningsMiss / cut

    Reported EPS 2.22 vs 2.23 expected (-0.6% surprise).

  2. 7
    2026-04-30EarningsBeat / raise

    Reported EPS 1.39 vs 0.99 expected (+40.6% surprise).

  3. 6
    2026-02-26EarningsBeat / raise

    Reported EPS 2.07 vs 1.95 expected (+6.4% surprise).

  4. 5
    2025-10-30EarningsBeat / raise

    Reported EPS 2.48 vs 2.3 expected (+7.7% surprise).

  5. 4
    2025-07-31EarningsBeat / raise

    Reported EPS 1.49 vs 1.4 expected (+6.4% surprise).

  6. 3
    2025-05-01EarningsBeat / raise

    Reported EPS 0.51 vs 0.34 expected (+51.2% surprise).

  7. 2
    2025-02-27EarningsBeat / raise

    Reported EPS 1.44 vs 1.22 expected (+18.0% surprise).

  8. 1
    2024-10-31EarningsBeat / raise

    Reported EPS 1.63 vs 1.23 expected (+32.3% surprise).

Alternative data that moves MTZ

Earnings history

EPS vs expectations
DateExpected EPSReported EPSSurprise
2026-07-302.232.22−0.6%
2026-04-300.991.39+40.6%
2026-02-261.952.07+6.4%
2025-10-302.32.48+7.7%
2025-07-311.41.49+6.4%
2025-05-010.340.51+51.2%
2025-02-271.221.44+18.0%
2024-10-311.231.63+32.3%
2024-08-010.870.96+10.5%
2024-05-02-0.48-0.13+72.7%
2024-02-290.440.66+50.4%
2023-10-311.840.95−48.4%
2023-08-030.850.89+4.3%
2023-05-04-0.57-0.54+5.0%
2023-02-230.981.03+4.8%
2022-11-031.281.34+4.9%
2022-08-040.720.73+1.8%
2022-05-05-0.11-0.03+71.6%
2022-02-241.281.1−14.4%
2021-11-041.691.81+6.9%
2021-08-051.231.3+5.4%
2021-05-060.771.1+42.7%
2021-02-251.661.75+5.6%
2020-10-291.661.68+0.9%

About MasTec

Website ↗

MasTec, Inc., an infrastructure engineering and construction company, provides engineering, building, installation, maintenance, and upgrade services for communications, energy, utility, and other infrastructure primarily in the United States and Canada. It operates through five segments: Communications, Clean Energy and Infrastructure, Power Delivery, Pipeline Infrastructure, and Other. The company builds infrastructure for wireless and wireline/fiber communications; clean energy infrastructure comprising renewable energy power generation; pipeline infrastructure, including natural gas, water, carbon capture sequestration, and other product transport; power delivery services, such as electrical and gas transmission, and distribution systems; industrial and heavy civil infrastructure, including roads, bridges, and rail; and water infrastructure. It also installs electrical and other gas …

37,000 employees · Coral Gables, United States

Interconnection queues measure in years. Energised megawatts — not empty shells — pace AI buildout, and new lines take the better part of a decade.

Generation→Queue study→Line + substation→Campus

What would prove us wrong. Weakens if queue reforms cut time-to-power below two years at scale.

Peers at the same bottleneck

Who else supplies this

StockRoleLast1D1MYTDTrend
PWR
Quanta Services
Grid construction and craft labour at scale $566.3+3.64%−12.8%+34.3%
MYRG
MYR Group
Transmission and electrical construction $261.5+2.77%−10.6%+19.7%
AEP
American Electric Power
765kV transmission and large-load interconnects $129.4−0.26%+9.3%+14.8%
NEE
NextEra Energy
Largest generation and transmission developer $82.14+0.05%+8.0%+4.6%

Not investment advice. Prices delayed and in local currency. Quotes in "double quotes" are verbatim as reported by the linked source; other commentary is our paraphrase. Earnings dates are estimates.