Daily
AI Infrastructure Daily: everything that happened across chips, memory, power, data centers and financing in a 3-minute read, every weekday. Free. Read today's →
NVDA$216.0+2.38%TSM$427.1+2.06%SK hynix₩1,275,000−0.16%Samsung Electronics₩213,000−1.16%MU$911.8+3.91%ASML$1,599.8+1.78%AVGO$330.6+2.76%LITE$834.8+10.40%COHR$224.3+7.18%ANET$178.9+3.81%GEV$858.4+5.32%ETN$374.6+2.31%VRT$200.1+2.98%CEG$253.7+0.12%VST$142.8+1.90%PWR$566.3+3.64%HD Hyundai Electric₩447,000−4.89%MP$37.91−1.03%FCX$65.21+0.04%CCJ$79.25+0.83%MSFT$530.4+1.12%META$638.8−0.60%CRWD$260.3+1.04%SMH$543.4+3.07%SPY$765.5+0.73%
NASDAQ · US · Engineering & Construction

MYRG MYR Group

Transmission and electrical construction

Tight but sold off Its supply chain is tightening but the stock is below its 50-day average — price and fundamentals disagree. (automatic: supply-chain trend + price vs 50-day average)
Last close (delayed) · 2026-10-26
$261.5
+2.77% today
1W
−8.2%
1M
−10.6%
3M
−23.2%
YTD
+19.7%
1Y
+19.1%
Off 52w high
−47.8%
Next earnings (est.): 2026-10-28
Market cap$3.96B
P/E (trailing)24.2Forward 17.6
EV / sales1.0×EV/EBITDA 13.4×
Revenue (TTM)$4.01BGrowth 20.1% y/y
Margins12.5%gross · op 6.2%
Free cash flow$177MCash $138M · debt $67.10M
Analyst target$382.0+46.1% upside · 5 analysts · buy
Riskβ 1.32Short 5.2% of float

Fundamentals from public market data, refreshed daily (2026-10-24 02:59 UTC). Figures in reporting currency.

MYRG · price with what management and the data said

Supply tighteningBeat / raiseMiss / cutData releaseEasing Hover a numbered marker for details · dashed lines = 50- and 200-day averages

Timeline: management commentary, data & earnings

8 events
  1. 8
    2026-07-29EarningsBeat / raise

    Reported EPS 3.17 vs 2.64 expected (+19.9% surprise).

  2. 7
    2026-04-29EarningsBeat / raise

    Reported EPS 2.99 vs 2.05 expected (+45.6% surprise).

  3. 6
    2026-02-25EarningsBeat / raise

    Reported EPS 2.33 vs 1.86 expected (+25.5% surprise).

  4. 5
    2025-10-29EarningsBeat / raise

    Reported EPS 2.05 vs 1.92 expected (+7.0% surprise).

  5. 4
    2025-07-30EarningsBeat / raise

    Reported EPS 1.7 vs 1.52 expected (+12.1% surprise).

  6. 3
    2025-04-30EarningsBeat / raise

    Reported EPS 1.45 vs 1.2 expected (+21.0% surprise).

  7. 2
    2025-02-26EarningsBeat / raise

    Reported EPS 0.99 vs 0.68 expected (+46.0% surprise).

  8. 1
    2024-10-30EarningsBeat / raise

    Reported EPS 0.65 vs 0.4 expected (+64.6% surprise).

Alternative data that moves MYRG

Earnings history

EPS vs expectations
DateExpected EPSReported EPSSurprise
2026-07-292.643.17+19.9%
2026-04-292.052.99+45.6%
2026-02-251.862.33+25.5%
2025-10-291.922.05+7.0%
2025-07-301.521.7+12.1%
2025-04-301.21.45+21.0%
2025-02-260.680.99+46.0%
2024-10-300.40.65+64.6%
2024-07-311.13-0.91−180.5%
2024-05-011.161.12−3.5%
2024-02-281.51.43−4.6%
2023-10-251.31.28−1.8%
2023-07-261.281.33+3.9%
2023-04-261.011.38+36.3%
2023-02-221.031.46+41.2%
2022-10-261.211.09−9.8%
2022-07-271.151.15+0.2%
2022-04-271.061.21+14.4%
2022-02-231.121.2+7.1%
2021-10-271.191.35+13.4%
2021-07-280.981.24+26.5%
2021-04-280.621.17+88.0%
2021-03-030.791.07+36.1%
2020-10-280.781.02+30.8%

About MYR Group

Website ↗

MYR Group Inc., through its subsidiaries, provides electrical construction services in the United States and Canada. The company operates through two segments: Transmission and Distribution, and Commercial and Industrial. Its Transmission and Distribution segment offers a range of services on electric transmission and distribution networks, and substation facilities, including design, engineering, procurement, construction, upgrade, maintenance, and repair services with primary focus on construction, maintenance, and repair to customers in the electric utility industry; and services, including construction and maintenance of high voltage transmission lines, substations, and lower voltage underground and overhead distribution systems, clean energy projects, and electric vehicle charging infrastructure services, as well as emergency restoration services in response to hurricane, wildfire, …

9,000 employees · Thornton, United States

Interconnection queues measure in years. Energised megawatts — not empty shells — pace AI buildout, and new lines take the better part of a decade.

Generation→Queue study→Line + substation→Campus

What would prove us wrong. Weakens if queue reforms cut time-to-power below two years at scale.

Electricians, pipefitters and commissioning crews are finite. Contractor backlogs are the human bottleneck behind every campus.

Design→Electrical→Mechanical→Commission

What would prove us wrong. Weakens if contractor backlogs flatten while data-centre announcements continue.

Peers at the same bottleneck

Who else supplies this

StockRoleLast1D1MYTDTrend
PWR
Quanta Services
Grid construction and craft labour at scale $566.3+3.64%−12.8%+34.3%
MTZ
MasTec
Power delivery and pipeline construction $174.4+1.98%−18.1%−19.8%
AEP
American Electric Power
765kV transmission and large-load interconnects $129.4−0.26%+9.3%+14.8%
NEE
NextEra Energy
Largest generation and transmission developer $82.14+0.05%+8.0%+4.6%
EME
EMCOR Group
Electrical and mechanical contractor $665.2+2.71%−12.7%+9.0%
FIX
Comfort Systems USA
Mechanical/electrical for data centres $1,261.8+8.70%−23.9%+35.4%
STRL
Sterling Infrastructure
Site development for data centres $367.3+3.38%−28.3%+19.9%
PRIM
Primoris Services
Power and utility construction $67.08+3.15%−7.6%−45.8%

Not investment advice. Prices delayed and in local currency. Quotes in "double quotes" are verbatim as reported by the linked source; other commentary is our paraphrase. Earnings dates are estimates.