Daily
AI Infrastructure Daily: everything that happened across chips, memory, power, data centers and financing in a 3-minute read, every weekday. Free. Read today's →
NVDA$216.0+2.38%TSM$427.1+2.06%SK hynix₩1,275,000−0.16%Samsung Electronics₩213,000−1.16%MU$911.8+3.91%ASML$1,599.8+1.78%AVGO$330.6+2.76%LITE$834.8+10.40%COHR$224.3+7.18%ANET$178.9+3.81%GEV$858.4+5.32%ETN$374.6+2.31%VRT$200.1+2.98%CEG$253.7+0.12%VST$142.8+1.90%PWR$566.3+3.64%HD Hyundai Electric₩447,000−4.89%MP$37.91−1.03%FCX$65.21+0.04%CCJ$79.25+0.83%MSFT$530.4+1.12%META$638.8−0.60%CRWD$260.3+1.04%SMH$543.4+3.07%SPY$765.5+0.73%
NYSE · US · Utilities - Regulated Electric

NEE NextEra Energy

Largest generation and transmission developer

Tight + uptrend Its supply chain is tightening and the stock trades above its 50-day average. (automatic: supply-chain trend + price vs 50-day average)
Last close (delayed) · 2026-10-26
$82.14
+0.05% today
1W
+5.1%
1M
+8.0%
3M
−7.3%
YTD
+4.6%
1Y
+0.1%
Off 52w high
−14.8%
Next earnings (est.): 2026-10-21
Market cap$172B
P/E (trailing)14.8Forward 18.8
EV / sales10.2×EV/EBITDA 21.9×
Revenue (TTM)$28.82BGrowth 1.6% y/y
Margins60.2%gross · op 33.0%
Free cash flow-$21.21BCash $5.58B · debt $114B
Analyst target$94.58+15.1% upside · 19 analysts · buy
Riskβ 0.64Short 2.8% of float · yield 3.04%

Fundamentals from public market data, refreshed daily (2026-10-24 02:59 UTC). Figures in reporting currency.

NEE · price with what management and the data said

Supply tighteningBeat / raiseMiss / cutData releaseEasing Hover a numbered marker for details · dashed lines = 50- and 200-day averages

Timeline: management commentary, data & earnings

8 events
  1. 8
    2026-10-21EarningsBeat / raise

    Reported EPS 1.24 vs 1.19 expected (+4.1% surprise).

  2. 7
    2026-07-24EarningsBeat / raise

    Reported EPS 1.15 vs 1.11 expected (+3.7% surprise).

  3. 6
    2026-04-23EarningsBeat / raise

    Reported EPS 1.09 vs 1.03 expected (+5.7% surprise).

  4. 5
    2026-01-27EarningsBeat / raise

    Reported EPS 0.54 vs 0.53 expected (+2.4% surprise).

  5. 4
    2025-10-28EarningsBeat / raise

    Reported EPS 1.13 vs 1.02 expected (+10.6% surprise).

  6. 3
    2025-07-23EarningsBeat / raise

    Reported EPS 1.05 vs 1.01 expected (+4.0% surprise).

  7. 2
    2025-04-22EarningsBeat / raise

    Reported EPS 0.99 vs 0.98 expected (+1.2% surprise).

  8. 1
    2025-01-24EarningsBeat / raise

    Reported EPS 0.53 vs 0.53 expected (+0.8% surprise).

Earnings history

EPS vs expectations
DateExpected EPSReported EPSSurprise
2026-10-211.191.24+4.1%
2026-07-241.111.15+3.7%
2026-04-231.031.09+5.7%
2026-01-270.530.54+2.4%
2025-10-281.021.13+10.6%
2025-07-231.011.05+4.0%
2025-04-220.980.99+1.2%
2025-01-240.530.53+0.8%
2024-10-230.971.03+5.9%
2024-07-240.950.96+1.1%
2024-04-230.80.91+13.4%
2024-01-250.490.52+6.6%
2023-10-240.880.94+6.6%
2023-07-250.810.88+8.2%
2023-04-250.760.84+10.0%
2023-01-250.490.51+4.2%
2022-10-280.80.85+5.9%
2022-07-220.760.81+7.0%
2022-04-210.720.74+3.4%
2022-01-250.40.41+3.0%
2021-10-200.720.75+4.7%
2021-07-230.690.71+2.8%
2021-04-210.610.67+9.4%
2021-01-260.380.4+4.2%

About NextEra Energy

Website ↗

NextEra Energy, Inc., through its subsidiaries, generates, stores, transmits, distributes, and sells electric power to retail and wholesale customers in North America. It operates through Florida Power & Light Company (FPL) and NEER segments. The company generates electricity from wind, solar, nuclear, natural gas, and other clean energy assets. It also invests in generation, storage, transmission, and distribution facilities; owns, develops, constructs, manages, and operates generation facilities, including renewables, nuclear and natural gas, and battery storage facilities in the wholesale energy market in the United States and Canada, as well as electric and gas transmission assets, and natural gas pipelines; provides full energy and capacity requirement services; markets and trades in energy-related commodities; and participates in the production of natural gas, natural gas liquids, …

17,400 employees · Juno Beach, United States

Interconnection queues measure in years. Energised megawatts — not empty shells — pace AI buildout, and new lines take the better part of a decade.

Generation→Queue study→Line + substation→Campus

What would prove us wrong. Weakens if queue reforms cut time-to-power below two years at scale.

Peers at the same bottleneck

Who else supplies this

StockRoleLast1D1MYTDTrend
PWR
Quanta Services
Grid construction and craft labour at scale $566.3+3.64%−12.8%+34.3%
MYRG
MYR Group
Transmission and electrical construction $261.5+2.77%−10.6%+19.7%
MTZ
MasTec
Power delivery and pipeline construction $174.4+1.98%−18.1%−19.8%
AEP
American Electric Power
765kV transmission and large-load interconnects $129.4−0.26%+9.3%+14.8%

Not investment advice. Prices delayed and in local currency. Quotes in "double quotes" are verbatim as reported by the linked source; other commentary is our paraphrase. Earnings dates are estimates.